Project Overview:
The Downtown Safety & Streetscape Project will take place on Main Street between Cherry and Mulberry Streets, on Market Street between Franklin and Water Streets, and around the Public Square. As previously announced, the project will include multiple safety, structural, and design upgrades to Troy’s historic downtown, including utility, sidewalk, curb, pavement, and aesthetic improvements.
In July of 2025, Council approved a proposed Prouty Plaza reconstruction as part of this larger reconstruction project.
Timeline:
The project went to bid in July 2026. A timeline is forthcoming.
Updates:
Supporting Project Information:
- Prouty Plaza Design Direction, presented by City staff to the City Council Committee of the Whole on July 14, 2025. This presentation includes further discussion of the brick pavers, seating and ADA accommodations proposed for Prouty Plaza.
- Downtown Streetscape Project Updates, presented by LJB Engineering for the Council Committee of the Whole meeting on March 10, 2025
- Updated Prouty Plaza landscape concepts by POD Design, February 28, 2025. This presentation includes updates made after the February 24, 2025 Committee of the Whole presentation.
- Downtown Streetscape Project Updates, September 13, 2024. This presentation includes initial renderings of the proposed Prouty Plaza designs.
- Preliminary design concepts and information, presented by LJB Engineering for the public meeting on May 22, 2024
- Preliminary design concepts and information, presented by LJB Engineering for the public meeting on April 17, 2024
- Streetscape Concepts Presentation by KZF Design for the City Council Work Session on October 31, 2022
FAQs:
The project intends to replace aging infrastructure. The curb and sidewalk require replacement, especially in areas where stormwater pools and trip hazards exist. The existing water lines require replacement to provide more capacity. There are portions where the walk is narrow between storefronts and vehicular areas. There are multiple locations where crosswalks can be improved to increase pedestrian safety.
Improvements in pedestrian safety are a priority of this project. There are multiple design elements addressing pedestrian safety.
- Proposed curb bump-outs at crosswalk locations reduce the crossing distance for pedestrians, provide better visibility of pedestrians, and help to influence vehicles to drive more slowly.
- Raised pedestrian refuge islands in the middle of the crosswalks on all four legs of the roundabout will constrain vehicle speeds while allowing pedestrians to focus on crossing one direction of traveled way at a time.
- Revisions to the locations of storm sewer catch basins will reduce the water ponding that currently forms at several of the existing curb ramps. Increasing sidewalk widths adjacent to the buildings within the square will provide more space for pedestrians between storefronts and the parking lots.
- The proposed sidewalk reconstruction will provide a more consistent surface as opposed to the existing sidewalk that has locations with uneven surfaces due to settling.
- The reconstructed curbs will provide a consistent curb height reveal and create a safer buffer between vehicles and pedestrians.
- Bollards and/or other forms of crowd protection will be evaluated for implementation with the project. These would provide pedestrian protection when the entire square or portions of the streets/parking are closed to vehicles during special events.
- Revisions to the roundabout geometry will pull the circulatory roadway away from the crosswalk locations and reduce competing decision-making for drivers.
Questions: